HsquaredTech

Singapore · Contract manufacturing

You will know where your part is.

We make precision parts for semiconductor, aerospace, medical and energy equipment. Machining capacity is not scarce — a supplier who tells you the truth about the schedule is. That is the part we built the company around.

Send drawings for a quoteSee how a job runs
24h

Quote turnaround (one business day) on a complete drawing package

48h

DFM comments back, before you commit to anything

±0.05mm

Guaranteed across the envelope — not a best-ever number

1

Named engineer on your job, from RFQ to delivery

What actually goes wrong

Four ways a supplier costs you money. None of them are machining.

If you have bought machined parts before, you have met at least two of these. Here is what we do about each one.

  1. The shop goes quiet

    Three weeks of silence, then a slipped date you find out about too late to re-plan around.

    You get a written update every week, whether or not there is news. Milestone dates are fixed when we quote, not after your PO lands.

  2. Parts fail your incoming inspection

    Nothing shipped with the parts, so the argument about whose measurement is right starts after your line has already stopped.

    A CMM report against your drawing ships in every box. Included, not an upcharge, and not something you have to ask for.

  3. Parts arrive contaminated

    Machined correctly, then bagged on a bench next to a grinder. A clean part packed dirty is a scrapped part.

    Cleaned and double-bagged to a written procedure we will send you before you order. The inner bag is opened inside your clean area.

  4. Nobody owns the problem

    The salesperson who quoted it has left the thread, and the engineer who could actually answer never joins the call.

    One named engineer on your job from RFQ to delivery. You have their address, and they have read your drawing.

What we make

Parts to drawings other shops send back.

Milled and turned components, sub-assemblies, and the cleaning and documentation that has to go with them. Prototype through low-volume production.

All capabilities in detail

Dimensional and geometric tolerance, by tier
TierToleranceµmWhat that means for your quote
Guaranteed±0.05 mm50 µmHeld as a matter of course across the envelope. Quoted without a yield allowance.
Held at ~95% first-pass±0.03 mm30 µmAchievable on qualifying features. We quote a small yield allowance rather than pretending it is free.
By arrangement±0.01 mm10 µmPossible, but both machining and verification cost rise steeply. Reviewed feature by feature at DFM before we commit.

Cleanliness

We publish our cleaning procedure. Almost nobody does.

Six stages, in order, with what each one is for and how it is checked. We do not operate a classified cleanroom and we do not claim an ISO class for the packing environment — we tell you exactly what happens to your part instead, and we will send you the written procedure before you place an order.

Cleaning and packaging, in order
#StageWhat it does
01DegreaseAqueous alkaline wash to remove cutting fluid and handling residue
02Ultrasonic washHeated ultrasonic bath, cycle time set by part geometry and feature depth
03Deionised rinseCascade DI rinse to a measured resistivity endpoint, so the rinse is verified rather than assumed
04Controlled dryFiltered hot-air dry, then cooled before packing — packing a warm part traps moisture in the bag
05Inspect and verifyVisual inspection under high-intensity light, plus a wipe test on request
06Double bagHeat-sealed inner and outer bag. The outer bag is removed at your airlock and the inner bag is opened inside your clean area

The full procedure, and what we do not have

How a job runs

Every gate has a number attached to it.

  1. You send drawings

    STEP, IGES or PDF. Files go straight to encrypted storage, not through an inbox. NDA first if you prefer.

    NDA countersigned within 24 h

  2. An engineer reads them

    Not a spreadsheet. You get comments on anything that will cost you money or yield — a tolerance that does not need to be that tight, a feature that will be expensive to fixture.

    DFM comments within 48 h

  3. You get a quote with dates in it

    Price, and the milestone dates we are committing to. Fixed at quote time, so you can plan around them before you raise a PO.

    Quote within 24 h (one business day)

  4. We make it, and you hear from us

    A written update every week — material in, first article, in process, inspection, packed. Including the weeks when the answer is that nothing moved.

    Weekly, in writing, whether or not there is news

  5. It ships with its paperwork

    Dimensional report against your drawing, cleaning record, and the packing detail. Everything your incoming inspection needs to accept the parts without a phone call.

    CMM inspection report with every shipment, at no extra charge

How we are set up

Engineering here. Machining at plants we audit.

Design review, supplier qualification, inspection and assembly are ours, in Singapore. Machining is executed by a manufacturing partner we qualified and audit — a group operating since 1980 across three plants, holding IATF 16949 and AS9100D among others.

Those certificates are our partner’s, not ours — we will not pretend otherwise. Ours is the accountability: we qualify the shop, we inspect the parts, and you deal with us.

Our quality system, stated plainly

3

Partner plants qualified and audited

65,000+sq ft

Combined manufacturing floor across the network

26

Engineers at the partner group

35

Dedicated QA and QC staff at the partner group

Quality system

Certification, stated precisely.

Your parts are made under an ISO 9001:2015 certified quality system — our manufacturing partner has held it for years, alongside IATF 16949 and AS9100D. That is the certificate that governs the machining itself.

HsquaredTech’s own ISO 9001, covering our Singapore scope — engineering, supplier qualification, incoming inspection and assembly — is in progress. We state both, because that is the distinction a supplier audit draws, and knowing which certificate covers which part of the job is genuinely useful to you.

The rest we publish outright. The cleaning procedure is on the site. The tolerance tiers are on the site. The escalation path has a name and a phone number on it. You should be able to audit us from the website before you ever send a drawing.

Send us something hard to make.

Upload your drawings and you will get DFM comments within 48 hours and a quote within 24 — one business day. If we are not the right shop for the part, we will tell you that instead.

Request a quoteWorking in semiconductor?