Which certificate covers what.

Machining runs under an ISO 9001:2015 certified system at our manufacturing partner. Inspection, supplier qualification and accountability are ours, in Singapore. Here is the whole arrangement, stated the way an auditor would want it.

Certification

Two sets of certificates, and they are not interchangeable.

Who holds what
StandardHeld byWhat it governs
ISO 9001:2015Manufacturing partnerThe machining itself — process control, traceability, corrective action
IATF 16949:2016Manufacturing partnerAutomotive-grade process discipline, applied across their production
AS9100DManufacturing partnerAerospace requirements: configuration management, product safety, flow-down
ISO 14001:2015Manufacturing partnerEnvironmental management
ISO 45001:2018Manufacturing partnerOccupational health and safety
ISO/IEC 27001:2022Manufacturing partnerInformation security — relevant to your drawings
ISO 9001:2015HsquaredTech — in progressEngineering, supplier qualification, incoming inspection and assembly

Supplier certificates do not transfer up a supply chain — your quality team knows that, so pointing at a partner’s certificate as though it were ours would fail at the first audit. Certificate copies and validity dates are available on request.

The controls

What actually protects the shipment.

A certificate describes a system. What determines whether the parts in your box are right is the sequence below, and it runs on every order.

  1. Supplier qualification

    Certification verified, a documented survey completed, and performance tracked per job. Qualification is a record, not a handshake.
  2. Drawing and revision control

    The revision we build to is recorded and printed on the inspection report — the single most common source of a dispute, removed.
  3. First article before production

    Inspected in full and approved before a batch runs. Nothing goes to volume on an assumption.
  4. Incoming inspection in Singapore

    Every batch is inspected here before it ships on to you. This is the control that matters most in this arrangement, and it is ours, not delegated.
  5. Cleaning and packing to a written procedure

    Recorded per batch, with the rinse verification reading, so the claim is evidenced rather than asserted.

    Published in full

  6. Documentation shipped with the parts

    CMM report, cleaning record, and material certificates where the drawing calls for them.

    CMM inspection report with every shipment, at no extra charge

When it goes wrong

You hear it from us, before it ships.

Something will eventually be out of tolerance, late, or wrong. The difference between suppliers is not whether that happens — it is whether you find out from them or from your own goods-in.

When a feature does not conform we tell you what the measurement is, what we think caused it, and what the options are: rework, remake, or a concession request if the feature is functionally fine. We do not ship a known deviation hoping it passes, and we do not let a date slip quietly and mention it at the end.

There is a named engineer on your job with a direct address, and an escalation path above them. Neither is a support inbox.


Request the quality manualWhat is on the inspection report

Questions

What a supplier audit asks.

Who holds which certificate?

Our manufacturing partner holds ISO 9001:2015, IATF 16949:2016, AS9100D, ISO 14001:2015, ISO 45001:2018 and ISO/IEC 27001:2022 — those govern the machining. HsquaredTech's own ISO 9001, scoped to engineering, supplier qualification, incoming inspection and assembly, is in progress. Supplier certificates do not transfer up a supply chain, so we state both rather than letting one stand for the other.

Can we audit you?

Yes, and we would rather you did. Ask and we will send the quality manual, the cleaning procedure, the inspection report template and our approved-supplier records. A remote audit can usually be done from documents; a site visit to the manufacturing partner is arranged case by case under NDA.

How do you qualify the manufacturing partner?

Certification verification, a documented supplier survey, and inspection of what actually arrives — because a certificate describes a system, not a shipment. Every batch is inspected in Singapore before it goes on to you, which is the control that matters most in this arrangement.

What happens when something goes wrong?

You hear it from us first. We tell you what the measurement is, what we think caused it, and what the options are — rework, remake, or a concession request if the feature is functionally fine. There is a named engineer on your job and an escalation path above them, and neither is a support inbox.

Do you accept our quality agreement?

Send it with the RFQ. We will read it and tell you at quote stage which clauses we meet today, which need a subcontractor, and which we cannot meet — rather than signing it and discovering the gap during your first audit.